The CERES TPC
Assembling the 'hamster cage'The inner ground cylinder
Details of the field cage
Preparing the TPC to insert a readout chamber module
(P)reparing and cleaning of readout chambers
The pad plane with chevron pads and anode wires
The outer cylinder, right: with cooling lines
A few front end boards (16 channels + ADC each) mounted, before cabling
The TPC leaves the clean room
The TPC for testing in the service position near the zone
In the zone: the TPC docked with the MIR and pushed into the magnet.
MWPC's installed for muon and laser tests
Cabling in the zone